MODUL-R system
Use of the MODUL-R system. (picture >>)
MODUL-R system
Jacks in place after formwork dismantling. (picture >>)
Quebecor Project
1900 MODUL-R jacks and 1600 frames simultaneously. (picture >>)
Sir Georges Simpson Project
More than 2000 MODUL-R jacks simultaneously. (picture >>)
Sherbrooke University - New Longueuil Campus
Project with more than 2500 MODUL-R jacks. (picture >>)
École de Technologie Supérieure (student residences) – Montreal
Hybrid assembly of both systems to support the slab with MODUL-R jacks and CLASSIQUE aluminium beams. (picture >>)
École de Technologie Supérieure (student residences) – Montreal
Hybrid assembly of both systems to support the slab with MODUL-R jacks and CLASSIQUE aluminium beams (picture >>)
Sherbrooke University - New Longueuil campus
Hybrid assembly of both systems to create flying forms with MODUL-R jacks and CLASSIQUE prefabricated slab formwork. (picture >>)
Sherbrooke University - New Longueuil campus
Hybrid assembly of both systems to create flying forms with MODUL-R jacks and CLASSIQUE prefabricated slab formwork. (picture >>)