Allunique SystemsSpecialists in scaffolding and formwork solutionsEquipment rental and manufacturing - Technical support and consultation - Engineering - Appraisals - Local and long distance delivery

Pictures

MODUL-R system

Use of the MODUL-R system. (picture >>)

MODUL-R system

Jacks in place after formwork dismantling. (picture >>)

Quebecor Project

1900 MODUL-R jacks and 1600 frames simultaneously. (picture >>)

Sir Georges Simpson Project

More than 2000 MODUL-R jacks simultaneously. (picture >>)

Sherbrooke University - New Longueuil Campus

Project with more than 2500 MODUL-R jacks. (picture >>)

École de Technologie Supérieure (student residences) – Montreal

Hybrid assembly of both systems to support the slab with MODUL-R jacks and CLASSIQUE aluminium beams. (picture >>)

École de Technologie Supérieure (student residences) – Montreal

Hybrid assembly of both systems to support the slab with MODUL-R jacks and CLASSIQUE aluminium beams (picture >>)

Sherbrooke University - New Longueuil campus

Hybrid assembly of both systems to create flying forms with MODUL-R jacks and CLASSIQUE prefabricated slab formwork. (picture >>)

Sherbrooke University - New Longueuil campus

Hybrid assembly of both systems to create flying forms with MODUL-R jacks and CLASSIQUE prefabricated slab formwork. (picture >>)

We scaffold the future with our
aluminium products of superior quality.